U233 Repackaging Perma-Con® and Gloved Enclosure System
Project Scope:
Repackage U233 oxide into suitable containers for transfer of material to Oak Ridge National Laboratory. Material stored for up to twenty years in outdated transfer containers.
Task required a special modular containment facility, material isolation gloved enclosure, material handling and packaging equipment, HEPA filtration equipment, and transfer operations performance.
Description:
RPS provides turn-key solution including equipment, procedures, and transfer operations performance.
Equipment utilizes specialized containment, isolation, and handling designs.
Operations require engineered controls and experienced radiological personnel.
Performance reviews conducted with client management and DOE operational readiness review teams.