TA54 FRP Box Line Project Modular Panel

TA54 FRP Box Line Project Modular Panel Containment System (MPCS)

TA54 FRP Box Line Project Modular PanelTA54 FRP Box Line Project Modular Panel

Project Scope:
  • Provide a prefabricated, modular paneled enclosure to support the characterization, size reduction, and repackaging of oversized TRU fiberglass reinforced waste boxes.
  • Enclosure designed using IBC methodology including seismic forces. Facility was classified as a Performance Category 1 SSC for natural phenomena hazards.
  • Largest Perma-Con® constructed to date, free span of 48 feet.
  • Enclosure was erected in a weather protective dome on top of an asphalt pad. Coordinated enclosure anchorage plan with new concrete foundation design to distribute facility ground loads.
  • Provide an electrical lighting design and associated hardware.
  • Integrated interface for ventilation, fire protection, and other utilities.
  • Provide onsite engineering support during the construction phase of this project.
Description:
  • This 48’ wide x 112’ long x 18’ tall modular panel containment system was fabricated and delivered on schedule in 17 weeks.
  • Mechanical assembly took approximately 5 weeks.
  • Maintained a project specific quality plan that addressed specific QA requirements of the contract.