AVLIS prototype testing requires a large isotope containment enclosure. Containment enclosure to meet seismic load requirements for Oak Ridge site, and be easily assembled and deconnable.
Containment certified to meet 0.4 inches water column negative pressure and have maximum in-situ air infiltration of less than 300 CFM.
Automatic air damper system to preclude leakage upon power loss.
On-site compliance certification testing required for air tightness.
Description:
RPS designs and delivers a modular panel enclosure measuring 16′ wide x 28′ long x 12′ high.
Modular panels are modified to incorporate seismic bracing to meet site criteria.
Pneumatic damper control system for power failure closure of air dampers.
Welding performed IAW AWS Structural Welding Code D1.1 (Certified Welders).
Certificate of compliance issued after successful on-site testing.