Metal Recycling Facility Perma-Con® and Hood System
Project Scope:
- Specialized containment systems required to support a proprietary hazardous waste recycling technology, Quantum-Catalytic Extraction Processing (Q-CEP):
- Containment for depleted Uranium Hexafluoride pilot processing plant.
- Containment for feed materials preparation for production processing.
Description:
RPS provides turn-key facility design services and delivers two modular panel containment facilities, supporting HEPA filtration systems and support equipment.
- Demonstration containment facility (16′ wide x 24′ long x 12′ high) including:
- Stainless steel walls and floor liner.
- 12′ high x 24′ long clear panel wall for maximum visual observation.
- Capture velocity air flow hood with elevator system for sample preparation.
- Explosion proof electrical service outlets.
- 12′ wide x 4′ long x 8′ high air-lock for access control.
- Twin, stacked 1000 CFM HEPA filtration units for CV Hood & containment negative pressure control.
- Project management and cost control expertise applied.
- Feed materials preparation containment facility (15′ wide x 36′ long x 13′ high with 16′ high bay area containment) including:
- Stainless steel walls.
- 11 gage, 4″ deep, stainless steel sump tank floor liner.
- 15′ wide x 16′ high removable wall section for equipment access.
- Sliding door for feed materials access.
- 8′ wide x 9′ long x 8′ high air-lock for access control.
- RPS designs, delivers and erects both facilities on time to support a fast-track project schedule and meet milestones.
PROJECT CATEGORIES
- Containment System
- Custom Demister Housing
- Gloved Enclosure System
- Perma-Con® and Back Draft Booth
- Perma-Con® and Gloved Enclosure System
- Perma-Con® and Hood System
- Perma-Con® System
- Plutonium Gloved Enclosure Seal Replacement System
- Portable Containment System
- Shielded Container
- Shielding System
- Ventilation System
Recent PROJECTS
-
-
-
VC-2000 HEPA Ventilation & Cooling Unit 05 March, 2024
-
Self-Cleaning Vent Unit for Plant Decommissioning 05 March, 2024